Proof of heating requirements (GModG)

Check and prove that the new heating system meets the requirements of the German Building Modernisation Act (GModG).

Since the end of July 2026 the German Building Modernisation Act (GModG) applies; the former 65 % obligation for renewable energy no longer exists. We check which requirement applies to your new heating system and how it is met, recalculate the heat pump shares for heat pump hybrid systems and document the result. For projects started before the new law, we prepare the proof under the previous GEG.

Quote within minutes · Processing time: Within 2 days after our confirmation that the required documents are complete. · Questions only when absolutely necessary

House with photovoltaics and heat pump, proof of the share of renewable energy
THE RESULT

What you receive.

  • Classification of your heating system under the Building Modernisation Act: which requirement applies and how it is met
  • For heat pump hybrid systems: proof of the heat pump's output and coverage share
  • Documented proof as a PDF; for older cases under the previous GEG

Basis: standards and regulations

  • Building Modernisation Act (GModG), 2026 version
  • For older cases: Building Energy Act (GEG) 2024, § 71

The proof does not replace energy consulting or a funding application. Which requirement applies depends on the building, the heating system and the timing; we clarify this in the proof.

Who is this service for?

Installers, owners and system planners. A single project or an extensive one: we agree the right scope.

AVAILABLE OR ORDER IN ADDITION

Which basis is needed?

We can use suitable existing calculations after checking them. An additional order is only needed if the relevant basis is missing or cannot be used.

Hydraulic schematic

With several heat generators, their integration must be clearly documented. A missing hydraulic schematic can be ordered from us separately.

Additional services are not automatically included in the price shown and are agreed in advance.

Delivery time & price

Within 2 days after our confirmation that the required documents are complete.

from 199,00 € incl. VAT Für eine Heizung in einem Gebäude bis 249 m². Bei größeren Gebäuden steigt der Preis mit der Fläche.

The specific quote is confirmed before the order is placed. Existing usable project data can reduce processing time and effort.

GOOD TO KNOW

Questions about the service.

Does the 65 % rule still apply?

No. It was abolished with the Building Modernisation Act. We check in the proof which requirement applies to your heating system instead.

How quickly will I receive the quote and the result?

Das Angebot liegt in der Regel wenige Minuten nach der Anfrage mit Plänen in Ihrem Kundenkonto. Bearbeitungszeit: Within 2 days after our confirmation that the required documents are complete. Bei Leistungen mit Heizlast brauchen wir Baujahr und Fenster (am besten gleich im Anfrageformular); weitere Rückfragen stellen wir nur, wenn eine Angabe weder aus den Unterlagen noch aus Normwerten ableitbar ist.

COORDINATED WITH EACH OTHER

Suitable additions.

EVERY PROJECT IS WELCOME

What are you planning?

A single room or a complex system network – we listen and clarify the right scope of services.

Discuss your project