Heat load calculation · recommended, not required
KfW requires a room-by-room heat load calculation. If you do not have one, the heat pump funding package is cheaper than ordering separately.
BzA and BnD from a single source – with deadlines tracked until payout.
Up to 70 % grant from KfW (programme 458) – if application, contract and evidence come in the right order. We check your installer's quote, prepare the confirmation for the application (BzA) and after installation the confirmation after completion (BnD) through our registered energy efficiency expert, and remind you of every deadline. Everything online, without an appointment on site.
Quote within minutes · Processing time: BzA within 2 working days after complete documents; BnD within 2 working days after complete invoices and evidence. · Questions only when absolutely necessary
Only KfW decides on the funding; our service does not include a funding approval. You submit the application and the evidence yourself in “Meine KfW” – with our values and step-by-step instructions. Residential buildings only.
Owners of residential buildings, homeowners' associations and heating installers for their customers. A single project or an extensive one: we agree the right scope.
No additional service from our offer is required. What matters are the project documents listed below.
KfW requires a room-by-room heat load calculation. If you do not have one, the heat pump funding package is cheaper than ordering separately.
KfW requires hydraulic balancing according to procedure B. The installer carrying out the work confirms the setting on site.
Additional services are not automatically included in the price shown and are agreed in advance.
BzA within 2 working days after complete documents; BnD within 2 working days after complete invoices and evidence.
from 399,00 € incl. VAT Für ein Ein- oder Zweifamilienhaus oder eine Eigentumswohnung, BzA und BnD zusammen. Mehrfamilienhaus mit 3 bis 6 Wohnungen 479 €, mit mehr als 6 Wohnungen oder WEG 559 €.
The specific quote is confirmed before the order is placed. Existing usable project data can reduce processing time and effort.
Yes, but only with a funding condition (suspensive or resolutory). You receive the suitable clause with the BzA. Only start work after the application.
You yourself in “Meine KfW”, with your BzA ID and our instructions with your values.
6 months. The application must be submitted within this period – we remind you in good time.
Yes. Installers create their own account and order for their customers.
Das Angebot liegt in der Regel wenige Minuten nach der Anfrage mit Plänen in Ihrem Kundenkonto. Bearbeitungszeit: BzA within 2 working days after complete documents; BnD within 2 working days after complete invoices and evidence. Bei Leistungen mit Heizlast brauchen wir Baujahr und Fenster (am besten gleich im Anfrageformular); weitere Rückfragen stellen wir nur, wenn eine Angabe weder aus den Unterlagen noch aus Normwerten ableitbar ist.
A single room or a complex system network – we listen and clarify the right scope of services.