We tell you clearly whether your house is suitable for a heat pump, and why. The basis is the heat demand, the flow temperature your radiators need and – if available – your previous consumption. If the house is not yet suitable, we state the reasons and the steps that make it ready for a heat pump.
Quote within minutes · Processing time: Within 2 days after our confirmation that the required documents are complete. · Questions only when absolutely necessary
THE RESULT
What you receive.
A clear statement: suitable for a heat pump or not – with a brief explanation
Guide value for the heat pump output including hot water
Concrete next steps to make your house ready for a heat pump
Verifiable PDF report with all inputs, assumptions and sources, checked by experts
Basis: standards and regulations
DIN EN 12831-1:2017-09 with DIN/TS 12831-1:2020-04 – room-by-room heat load
VDI 4645 – planning and sizing of heat pump systems
DIN EN 442-2 – output of the existing radiators
The check is not acoustic, electrical, permit or economic planning and not a guarantee of consumption or eligibility for funding. Required detailed checks are named.
Who is this service for?
Owners, heating installers and wholesalers. A single project or an extensive one: we agree the right scope.
NO FURTHER CALCULATION REQUIRED
Which basis is needed?
No additional service from our offer is required. What matters are the project documents listed below.
Recommended addition
Heat load calculation · recommended, not required
Recommended, but not required. We determine the room heat loads needed for this ourselves from your plans. You can quickly and easily add a complete heat load calculation, for example for sizing a heat pump; we are happy to use an existing calculation.
Additional services are not automatically included in the price shown and are agreed in advance.
Delivery time & price
Within 2 days after our confirmation that the required documents are complete.
from 199,00 € incl. VAT Für eine Wohneinheit. Die Raumwerte schätzen wir aus Ihren Plänen, eine vorhandene Heizlastberechnung ist nicht erforderlich.
The specific quote is confirmed before the order is placed. Existing usable project data can reduce processing time and effort.
GOOD TO KNOW
Questions about the service.
Is the previous energy consumption enough?
It helps with classification, but does not replace the room-by-room design and check of the heating surfaces.
Do we need a heat load calculation?
No. We estimate the heat demand from your plans and check it against your consumption, if available. We are happy to use an existing heat load calculation.
What happens without radiator details?
Then we assess heat demand and consumption; the necessary flow temperature remains open and can be added with the radiator check.
How quickly will I receive the quote and the result?
Das Angebot liegt in der Regel wenige Minuten nach der Anfrage mit Plänen in Ihrem Kundenkonto. Bearbeitungszeit: Within 2 days after our confirmation that the required documents are complete. Bei Leistungen mit Heizlast brauchen wir Baujahr und Fenster (am besten gleich im Anfrageformular); weitere Rückfragen stellen wir nur, wenn eine Angabe weder aus den Unterlagen noch aus Normwerten ableitbar ist.