Heizlastprofi
TECHNICAL PLANNING · THROUGHOUT GERMANY

Drinking water calculation

An installation sized to actual demand.

We plan the sizing of the agreed drinking water installation based on use, draw-off points and supply conditions. Cold water, hot water and – if ordered – circulation are taken into account within the respective project scope.

Quote within minutes · Processing time: Within 2 days after our confirmation that the required documents are complete. · Questions only when absolutely necessary

Drinking water installation with storage tank, cold and hot water pipes to washbasin and shower
THE RESULT

What you receive.

  • Calculation of the agreed drinking water pipes
  • Sizes and documented pressure boundary conditions
  • Coordinated result documents and, if ordered, circulation design

Basis: standards and regulations

  • DIN 1988-300 – determination of pipe diameters
  • DIN EN 806-3 – drinking water installation
  • DVGW W 553 – circulation systems, if ordered

Special uses, simultaneity and hygiene requirements are clarified in advance. The calculation alone does not replace a hygiene inspection or acceptance of the installation carried out.

Who is this service for?

Heating installers, planners, housing companies and wholesalers. A single project or an extensive one: we agree the right scope.

NO FURTHER CALCULATION REQUIRED

Which basis is needed?

No additional service from our offer is required. What matters are the project documents listed below.

Additional services are not automatically included in the price shown and are agreed in advance.

Delivery time & price

Within 2 days after our confirmation that the required documents are complete.

from 399,00 € incl. VAT Für eine Wohneinheit mit bis zu 10 Entnahmestellen, Kalt- und Warmwasser. Eine Zirkulationsauslegung wird separat vereinbart.

The specific quote is confirmed before the order is placed. Existing usable project data can reduce processing time and effort.

GOOD TO KNOW

Questions about the service.

Which standards are taken into account?

The requirements relevant to the project, in particular DIN 1988-300 and DIN EN 806, are coordinated with the use and the scope of calculation.

Is circulation automatically included?

The scope is explicitly defined in the quote. Please state whether a circulation design is needed.

How quickly will I receive the quote and the result?

Das Angebot liegt in der Regel wenige Minuten nach der Anfrage mit Plänen in Ihrem Kundenkonto. Bearbeitungszeit: Within 2 days after our confirmation that the required documents are complete. Bei Leistungen mit Heizlast brauchen wir Baujahr und Fenster (am besten gleich im Anfrageformular); weitere Rückfragen stellen wir nur, wenn eine Angabe weder aus den Unterlagen noch aus Normwerten ableitbar ist.

COORDINATED WITH EACH OTHER

Suitable additions.

EVERY PROJECT IS WELCOME

What are you planning?

A single room or a complex system network – we listen and clarify the right scope of services.

Discuss your project