Heizlastprofi
BERLIN

Heat load calculation in Berlin

In Berlin, 43.1 % of homes are heated with district heating and 45.6 % with gas, and 64.7 % of buildings with living space date from before 1979. Berlin's heat plan 2026 shows for every neighbourhood (Kiez) whether a heating network is coming or the house needs its own solution. For the heat pump, the room-by-room heat load is the basis.

Buildings and heating systems in Berlin

BUILT BEFORE 1979

64,7 %

338.663 Buildings with living space, of which this share was built before the first Thermal Insulation Ordinance (Wärmeschutzverordnung)
GAS HEATING

45,6 %

2.018.831 Homes, of which this share are heated with gas
HEATING OIL

8,9 %

Share of homes with oil heating
DISTRICT HEATING

43,1 %

Share of homes with district heating

Source: Zensus 2022, Statistische Ämter des Bundes und der Länder – Gemeindeergebnisse Berlin (aufbereitet von wahlatlas.net), Reference date 15.05.2022

Heat planning and heating replacement in Berlin

What this means for your house

If your house is in an area of decentralised supply – which applies to about a third of Berlin's buildings – a heat pump is usually an option; in a water protection area, this is more likely to be an air-source heat pump than geothermal energy. The room-by-room heat load calculation shows what output is required and whether your radiators are sufficient.

Frequently asked questions from Berlin

How can I tell whether my neighbourhood (Kiez) in Berlin will get district heating?

The heat maps of Berlin's heat plan show the expected heat supply areas, i.e. heating network areas, areas under review and areas of decentralised supply. For houses outside the heating network areas, we calculate the heat load for a heat pump.

Do you come to my home for the heat load calculation?

No, that is not necessary. You upload floor plans, sections and photos online – for a house in Berlin just as anywhere else in Germany. If anything is missing, we ask for it specifically.

How quickly will I receive the result?

You receive your quote within a few minutes. We deliver the expert-checked result within 2 days of our confirmation that the required documents are complete.

Is the calculation sufficient for KfW funding?

Yes. The room-by-room heat load calculation according to DIN EN 12831-1 and hydraulic balancing according to procedure B are the evidence required for heat pump funding.

Sources

All information about the city is publicly available data from the bodies named (retrieved on 19.11.2026). The city and the energy supplier decide on connection to a heating network; the heat load calculation itself applies to your building regardless.

More cities

All cities