Heizlastprofi
HAMBURG

Heat load calculation in Hamburg

In Hamburg, 54.5 % of homes are heated with gas and 35 % with district heating, and 66.2 % of buildings with living space date from before 1979. According to the heat plan, around 78 % of all buildings are to be supplied in a decentralised way in future, mainly with heat pumps. For the heat pump, the room-by-room heat load is the basis.

Buildings and heating systems in Hamburg

BUILT BEFORE 1979

66,2 %

260.630 Buildings with living space, of which this share was built before the first Thermal Insulation Ordinance (Wärmeschutzverordnung)
GAS HEATING

54,5 %

985.422 Homes, of which this share are heated with gas
HEATING OIL

7,2 %

Share of homes with oil heating
DISTRICT HEATING

35,0 %

Share of homes with district heating

Source: Zensus 2022, Statistische Ämter des Bundes und der Länder – Gemeindeergebnisse Hamburg (aufbereitet von wahlatlas.net), Reference date 15.05.2022

Heat planning and heating replacement in Hamburg

What this means for your house

For around 78 % of Hamburg's buildings, the heat plan envisages individual, decentralised supply – usually with a heat pump; heating networks are growing mainly in Wilhelmsburg, Rothenburgsort, Veddel and the eastern HafenCity. The room-by-room heat load calculation shows what output your house needs and whether your radiators are sufficient.

Frequently asked questions from Hamburg

Will my district of Hamburg get a heating network?

The heat plan map in the city's heat portal shows this: it indicates the most suitable supply for each area. For houses in areas with decentralised supply, we calculate the heat load for a heat pump.

Do you come to my home for the heat load calculation?

No, that is not necessary. You upload floor plans, sections and photos online – for a house in Hamburg just as anywhere else in Germany. If anything is missing, we ask for it specifically.

How quickly will I receive the result?

You receive your quote within a few minutes. We deliver the expert-checked result within 2 days of our confirmation that the required documents are complete.

Is the calculation sufficient for KfW funding?

Yes. The room-by-room heat load calculation according to DIN EN 12831-1 and hydraulic balancing according to procedure B are the evidence required for heat pump funding.

Sources

All information about the city is publicly available data from the bodies named (retrieved on 19.11.2026). The city and the energy supplier decide on connection to a heating network; the heat load calculation itself applies to your building regardless.

More cities

All cities