Heizlastprofi
SAARBRÜCKEN · SAARLAND

Heat load calculation in Saarbrücken

In Saarbrücken, over 80 % of residential buildings date from before 1979, and almost one in three homes is already connected to district heating. The city council adopted the heat plan in June 2026 – for most of the city it envisages heat pumps.

Buildings and heating systems in Saarbrücken

BUILT BEFORE 1979

82,0 %

37.393 Buildings with living space, of which this share was built before the first Thermal Insulation Ordinance (Wärmeschutzverordnung)
GAS HEATING

55,3 %

103.695 Homes, of which this share are heated with gas
HEATING OIL

11,9 %

Share of homes with oil heating
DISTRICT HEATING

30,0 %

Share of homes with district heating

Source: Zensus 2022, Statistische Ämter des Bundes und der Länder – Gemeindeergebnisse Saarbrücken (aufbereitet von wahlatlas.net), Reference date 15.05.2022

Heat planning and heating replacement in Saarbrücken

What this means for your house

If your house is outside the district heating areas, the heat pump is the intended route. For houses built before 1979, the room-by-room heat load shows which rooms determine the flow temperature and where larger radiators help.

Frequently asked questions from Saarbrücken

Do I have to take action in Saarbrücken because of the heat plan?

No, the heat plan is a strategic instrument with no direct obligations for owners. If a heating replacement is due, the heat load calculation is the basis.

Do you come to my home for the heat load calculation?

No, that is not necessary. You upload floor plans, sections and photos online – for a house in Saarbrücken just as anywhere else in Germany. If anything is missing, we ask for it specifically.

How quickly will I receive the result?

You receive your quote within a few minutes. We deliver the expert-checked result within 2 days of our confirmation that the required documents are complete.

Is the calculation sufficient for KfW funding?

Yes. The room-by-room heat load calculation according to DIN EN 12831-1 and hydraulic balancing according to procedure B are the evidence required for heat pump funding.

Sources

All information about the city is publicly available data from the bodies named (retrieved on 18.11.2026). The city and the energy supplier decide on connection to a heating network; the heat load calculation itself applies to your building regardless.

More cities

All cities