Heat load calculation in Bremen

In Bremen, 75.1 % of buildings with living space date from before 1979, and 67.5 % of homes are heated with gas. The municipality's heat plan shows where heating networks are to grow and where houses will be supplied in a decentralised way. For the heat pump, the room-by-room heat load is the basis.

Buildings and heating systems in Bremen

BUILT BEFORE 1979

75,1 %

122.273 Buildings with living space, of which this share was built before the first Thermal Insulation Ordinance (Wärmeschutzverordnung)
GAS HEATING

67,5 %

300.020 Homes, of which this share are heated with gas
HEATING OIL

12,0 %

Share of homes with oil heating
DISTRICT HEATING

19,0 %

Share of homes with district heating

Source: Zensus 2022, Statistische Ämter des Bundes und der Länder – Gemeindeergebnisse Bremen (aufbereitet von wahlatlas.net), Reference date 15.05.2022

Heat planning and heating replacement in Bremen

What this means for your house

If your house is in an area for decentralised supply, an air-source or ground-source heat pump is usually the obvious solution – groundwater is hardly an option in Bremen, and water protection area requirements apply in the north-west. The room-by-room heat load calculation shows what output is required and whether your radiators are sufficient.

Frequently asked questions from Bremen

My block in Bremen is in an area under review – what does that mean?

According to the heat plan, in areas under review it is still open whether a heating network or decentralised supply is more economical; the first update is planned by 2028. If you are considering a heat pump, we calculate the room-by-room heat load for it.

Do you come to my home for the heat load calculation?

No, that is not necessary. You upload floor plans, sections and photos online – for a house in Bremen just as anywhere else in Germany. If anything is missing, we ask for it specifically.

How quickly will I receive the result?

You receive your quote within a few minutes. We deliver the expert-checked result within 2 days of our confirmation that the required documents are complete.

Is the calculation sufficient for KfW funding?

Yes. The room-by-room heat load calculation according to DIN EN 12831-1 and hydraulic balancing according to procedure B are the evidence required for heat pump funding.