Heizlastprofi
BREMERHAVEN · BREMEN

Heat load calculation in Bremerhaven

In Bremerhaven, 74.6 % of buildings with living space date from before 1979; 61.8 % of homes are heated with gas and 20.7 % with district heating. The heat plan names 13 sub-areas in which heating networks are being examined – decentralised supply is envisaged everywhere else. For the heat pump, the room-by-room heat load is the basis.

Buildings and heating systems in Bremerhaven

BUILT BEFORE 1979

74,6 %

21.765 Buildings with living space, of which this share was built before the first Thermal Insulation Ordinance (Wärmeschutzverordnung)
GAS HEATING

61,8 %

64.777 Homes, of which this share are heated with gas
HEATING OIL

15,6 %

Share of homes with oil heating
DISTRICT HEATING

20,7 %

Share of homes with district heating

Source: Zensus 2022, Statistische Ämter des Bundes und der Länder – Gemeindeergebnisse Bremerhaven (aufbereitet von wahlatlas.net), Reference date 15.05.2022

Heat planning and heating replacement in Bremerhaven

What this means for your house

If your house is outside the 13 areas under review, the heat plan envisages decentralised supply – usually with an air-source heat pump, as groundwater and geothermal energy can only be used to a limited extent in Bremerhaven. The room-by-room heat load calculation shows what output is required and whether your radiators are sufficient.

Frequently asked questions from Bremerhaven

Do I have to replace my heating in Bremerhaven because of the heat plan?

No, the heat plan is a strategic instrument from which no rights or obligations arise for residents. If you are thinking about a heat pump, we calculate the room-by-room heat load for it.

Do you come to my home for the heat load calculation?

No, that is not necessary. You upload floor plans, sections and photos online – for a house in Bremerhaven just as anywhere else in Germany. If anything is missing, we ask for it specifically.

How quickly will I receive the result?

You receive your quote within a few minutes. We deliver the expert-checked result within 2 days of our confirmation that the required documents are complete.

Is the calculation sufficient for KfW funding?

Yes. The room-by-room heat load calculation according to DIN EN 12831-1 and hydraulic balancing according to procedure B are the evidence required for heat pump funding.

Sources

All information about the city is publicly available data from the bodies named (retrieved on 19.11.2026). The city and the energy supplier decide on connection to a heating network; the heat load calculation itself applies to your building regardless.

More cities in Bremen

Heat load calculation in Bremen · All cities