Heizlastprofi
KONSTANZ · BADEN-WÜRTTEMBERG

Heat load calculation in Konstanz

Konstanz is aiming for extensive climate neutrality by 2035 – today more than 90 % of its heat is still generated from fossil fuels. One in five homes is heated with oil, and many houses in the outlying localities will continue to need their own heating system in future.

Buildings and heating systems in Konstanz

BUILT BEFORE 1979

67,4 %

11.365 Buildings with living space, of which this share was built before the first Thermal Insulation Ordinance (Wärmeschutzverordnung)
GAS HEATING

64,4 %

46.640 Homes, of which this share are heated with gas
HEATING OIL

20,4 %

Share of homes with oil heating
DISTRICT HEATING

7,7 %

Share of homes with district heating

Source: Zensus 2022, Statistische Ämter des Bundes und der Länder – Gemeindeergebnisse Konstanz (aufbereitet von wahlatlas.net), Reference date 15.05.2022

Heat planning and heating replacement in Konstanz

What this means for your house

If you live in Litzelstetten, Wallhausen, Dingelsdorf or Dettingen, there will probably be no heating network for your house. The room-by-room heat load shows which heat pump can replace the oil heating.

Frequently asked questions from Konstanz

I heat with oil in Dingelsdorf – which heat pump do I need?

That depends on the heat load of your house, not on the output of the old boiler. We calculate it room by room from your plans; a smaller heat pump than expected is often sufficient.

Do you come to my home for the heat load calculation?

No, that is not necessary. You upload floor plans, sections and photos online – for a house in Konstanz just as anywhere else in Germany. If anything is missing, we ask for it specifically.

How quickly will I receive the result?

You receive your quote within a few minutes. We deliver the expert-checked result within 2 days of our confirmation that the required documents are complete.

Is the calculation sufficient for KfW funding?

Yes. The room-by-room heat load calculation according to DIN EN 12831-1 and hydraulic balancing according to procedure B are the evidence required for heat pump funding.

Sources

All information about the city is publicly available data from the bodies named (retrieved on 18.11.2026). The city and the energy supplier decide on connection to a heating network; the heat load calculation itself applies to your building regardless.

More cities in Baden-Württemberg

Heat load calculation in Aalen · Heat load calculation in Baden-Baden · Heat load calculation in Böblingen · Heat load calculation in Esslingen · Heat load calculation in Freiburg · Heat load calculation in Friedrichshafen · Heat load calculation in Göppingen · Heat load calculation in Heidelberg · Heat load calculation in Heilbronn · Heat load calculation in Karlsruhe · Heat load calculation in Ludwigsburg · Heat load calculation in Mannheim · Heat load calculation in Offenburg · Heat load calculation in Pforzheim · Heat load calculation in Rastatt · Heat load calculation in Reutlingen · Heat load calculation in Schwäbisch Gmünd · Heat load calculation in Sindelfingen · Heat load calculation in Stuttgart · Heat load calculation in Tübingen · Heat load calculation in Ulm · Heat load calculation in Villingen-Schwenningen · Heat load calculation in Waiblingen · All cities