Heizlastprofi
LUDWIGSBURG · BADEN-WÜRTTEMBERG

Heat load calculation in Ludwigsburg

Ludwigsburg aims to generate its heat climate-neutrally by 2035 – today around 90 % comes from natural gas and heating oil. District heating is to quadruple, but a large proportion of houses will continue to rely on solutions in their own building.

Buildings and heating systems in Ludwigsburg

BUILT BEFORE 1979

67,7 %

15.173 Buildings with living space, of which this share was built before the first Thermal Insulation Ordinance (Wärmeschutzverordnung)
GAS HEATING

66,4 %

46.835 Homes, of which this share are heated with gas
HEATING OIL

12,0 %

Share of homes with oil heating
DISTRICT HEATING

15,1 %

Share of homes with district heating

Source: Zensus 2022, Statistische Ämter des Bundes und der Länder – Gemeindeergebnisse Ludwigsburg (aufbereitet von wahlatlas.net), Reference date 15.05.2022

Heat planning and heating replacement in Ludwigsburg

What this means for your house

If your house is in a decentralised area, you decide on the new heating system yourself. The room-by-room heat load shows how large a heat pump needs to be – before and after a renovation.

Frequently asked questions from Ludwigsburg

Is my house in Ludwigsburg a case for district heating?

The heat plan's areas under review and the plans of the municipal utility (Stadtwerke) show this. Outside them, we calculate the heat load for a heat pump.

Do you come to my home for the heat load calculation?

No, that is not necessary. You upload floor plans, sections and photos online – for a house in Ludwigsburg just as anywhere else in Germany. If anything is missing, we ask for it specifically.

How quickly will I receive the result?

You receive your quote within a few minutes. We deliver the expert-checked result within 2 days of our confirmation that the required documents are complete.

Is the calculation sufficient for KfW funding?

Yes. The room-by-room heat load calculation according to DIN EN 12831-1 and hydraulic balancing according to procedure B are the evidence required for heat pump funding.

Sources

All information about the city is publicly available data from the bodies named (retrieved on 18.11.2026). The city and the energy supplier decide on connection to a heating network; the heat load calculation itself applies to your building regardless.

More cities in Baden-Württemberg

Heat load calculation in Aalen · Heat load calculation in Baden-Baden · Heat load calculation in Böblingen · Heat load calculation in Esslingen · Heat load calculation in Freiburg · Heat load calculation in Friedrichshafen · Heat load calculation in Göppingen · Heat load calculation in Heidelberg · Heat load calculation in Heilbronn · Heat load calculation in Karlsruhe · Heat load calculation in Konstanz · Heat load calculation in Mannheim · Heat load calculation in Offenburg · Heat load calculation in Pforzheim · Heat load calculation in Rastatt · Heat load calculation in Reutlingen · Heat load calculation in Schwäbisch Gmünd · Heat load calculation in Sindelfingen · Heat load calculation in Stuttgart · Heat load calculation in Tübingen · Heat load calculation in Ulm · Heat load calculation in Villingen-Schwenningen · Heat load calculation in Waiblingen · All cities