Heizlastprofi
BAD HOMBURG V. D. HÖHE · HESSE

Heat load calculation in Bad Homburg v. d. Höhe

Bad Homburg aims to be climate-neutral in energy terms by 2035. In the climate protection strategy, around 72 % of buildings will heat with a heat pump in future – whereas today almost three quarters of homes run on gas.

Buildings and heating systems in Bad Homburg

BUILT BEFORE 1979

65,8 %

10.891 Buildings with living space, of which this share was built before the first Thermal Insulation Ordinance (Wärmeschutzverordnung)
GAS HEATING

72,5 %

28.501 Homes, of which this share are heated with gas
HEATING OIL

17,9 %

Share of homes with oil heating
DISTRICT HEATING

6,5 %

Share of homes with district heating

Source: Zensus 2022, Statistische Ämter des Bundes und der Länder – Gemeindeergebnisse Bad Homburg v. d. Höhe (aufbereitet von wahlatlas.net), Reference date 15.05.2022

Heat planning and heating replacement in Bad Homburg

What this means for your house

If almost three quarters of houses are to heat with a heat pump by 2035, the room-by-room heat load is the first step. It shows what output your house needs – before and after a renovation.

Frequently asked questions from Bad Homburg

Is a heat pump worthwhile for my house in Bad Homburg?

The heat load calculation together with a check of your radiators will show you. Many houses manage without major alterations – what matters is correct sizing.

Do you come to my home for the heat load calculation?

No, that is not necessary. You upload floor plans, sections and photos online – for a house in Bad Homburg just as anywhere else in Germany. If anything is missing, we ask for it specifically.

How quickly will I receive the result?

You receive your quote within a few minutes. We deliver the expert-checked result within 2 days of our confirmation that the required documents are complete.

Is the calculation sufficient for KfW funding?

Yes. The room-by-room heat load calculation according to DIN EN 12831-1 and hydraulic balancing according to procedure B are the evidence required for heat pump funding.