Heizlastprofi
FRANKFURT AM MAIN · HESSE

Heat load calculation in Frankfurt am Main

In Frankfurt, three out of four homes are heated with gas, and more than a third of residential buildings date from before 1949. With the adopted heat plan, the switch can be planned: district heating in densely built areas, heat pumps and other individual solutions everywhere else.

Buildings and heating systems in Frankfurt

BUILT BEFORE 1979

74,4 %

80.679 Buildings with living space, of which this share was built before the first Thermal Insulation Ordinance (Wärmeschutzverordnung)
GAS HEATING

75,4 %

402.826 Homes, of which this share are heated with gas
HEATING OIL

6,6 %

Share of homes with oil heating
DISTRICT HEATING

15,4 %

Share of homes with district heating

Source: Zensus 2022, Statistische Ämter des Bundes und der Länder – Gemeindeergebnisse Frankfurt am Main (aufbereitet von wahlatlas.net), Reference date 15.05.2022

Heat planning and heating replacement in Frankfurt

What this means for your house

For a detached or terraced house in Frankfurt, a heat pump is often the obvious solution. The room-by-room heat load calculation shows what output is really needed – in older buildings often less than the old gas heating had.

Frequently asked questions from Frankfurt

Does Frankfurt's heat plan dictate which heating system I must have?

No. The heat plan is a guide to which supply is possible in an area. You decide which heating system you install – the heat load calculation provides the basis.

Do you come to my home for the heat load calculation?

No, that is not necessary. You upload floor plans, sections and photos online – for a house in Frankfurt just as anywhere else in Germany. If anything is missing, we ask for it specifically.

How quickly will I receive the result?

You receive your quote within a few minutes. We deliver the expert-checked result within 2 days of our confirmation that the required documents are complete.

Is the calculation sufficient for KfW funding?

Yes. The room-by-room heat load calculation according to DIN EN 12831-1 and hydraulic balancing according to procedure B are the evidence required for heat pump funding.