Heizlastprofi
MARBURG · HESSE

Heat load calculation in Marburg

In Marburg, around seven in ten homes heat with gas and almost one in five with oil. The Stadtwerke are converting their district heating, but a large proportion of houses will need their own solution – and the ground beneath Marburg is well suited to geothermal energy.

Buildings and heating systems in Marburg

BUILT BEFORE 1979

69,6 %

13.610 Buildings with living space, of which this share was built before the first Thermal Insulation Ordinance (Wärmeschutzverordnung)
GAS HEATING

69,9 %

42.090 Homes, of which this share are heated with gas
HEATING OIL

18,5 %

Share of homes with oil heating
DISTRICT HEATING

5,9 %

Share of homes with district heating

Source: Zensus 2022, Statistische Ämter des Bundes und der Länder – Gemeindeergebnisse Marburg (aufbereitet von wahlatlas.net), Reference date 15.05.2022

Heat planning and heating replacement in Marburg

What this means for your house

For a ground-source heat pump, the heat load is doubly important: it determines the heat pump and the length of the boreholes. The room-by-room calculation provides the basis for planning and funding.

Frequently asked questions from Marburg

Can I drill a borehole heat exchanger in Marburg?

In many locations yes, with a permit from the lower water authority (Untere Wasserbehörde) of the Marburg-Biedenkopf district. You need the heat load calculation to size the heat pump and boreholes correctly.

Do you come to my home for the heat load calculation?

No, that is not necessary. You upload floor plans, sections and photos online – for a house in Marburg just as anywhere else in Germany. If anything is missing, we ask for it specifically.

How quickly will I receive the result?

You receive your quote within a few minutes. We deliver the expert-checked result within 2 days of our confirmation that the required documents are complete.

Is the calculation sufficient for KfW funding?

Yes. The room-by-room heat load calculation according to DIN EN 12831-1 and hydraulic balancing according to procedure B are the evidence required for heat pump funding.