Heat load calculation in Rüsselsheim am Main

In Rüsselsheim, almost four in five homes heat with gas and only 2 % with district heating. The city is drawing up its heat plan together with the Stadtwerke – for the vast majority of houses, heating will remain a matter for each individual house in future too.

Buildings and heating systems in Rüsselsheim

BUILT BEFORE 1979

69,7 %

10.977 Buildings with living space, of which this share was built before the first Thermal Insulation Ordinance (Wärmeschutzverordnung)
GAS HEATING

78,9 %

30.991 Homes, of which this share are heated with gas
HEATING OIL

11,9 %

Share of homes with oil heating
DISTRICT HEATING

2,0 %

Share of homes with district heating

Source: Zensus 2022, Statistische Ämter des Bundes und der Länder – Gemeindeergebnisse Rüsselsheim am Main (aufbereitet von wahlatlas.net), Reference date 15.05.2022

Heat planning and heating replacement in Rüsselsheim

What this means for your house

Until the heat plan is complete, one thing is clear for most houses in Rüsselsheim: a heating network is unlikely. The room-by-room heat load shows which heat pump can replace your gas heating.

Frequently asked questions from Rüsselsheim

Should I wait for the heat plan in Rüsselsheim?

A working heating system may continue to run. If a replacement is due, the heat load calculation provides clarity – it applies regardless of what the heat plan later provides for.

Do you come to my home for the heat load calculation?

No, that is not necessary. You upload floor plans, sections and photos online – for a house in Rüsselsheim just as anywhere else in Germany. If anything is missing, we ask for it specifically.

How quickly will I receive the result?

You receive your quote within a few minutes. We deliver the expert-checked result within 2 days of our confirmation that the required documents are complete.

Is the calculation sufficient for KfW funding?

Yes. The room-by-room heat load calculation according to DIN EN 12831-1 and hydraulic balancing according to procedure B are the evidence required for heat pump funding.