Heizlastprofi
DARMSTADT · HESSE

Heat load calculation in Darmstadt

In Darmstadt, almost three quarters of homes are heated with gas, and 45 % of residential buildings date from the years 1949 to 1978. The city's heat plan shows where district heating is coming – everywhere else, the heat pump becomes the most important solution.

Buildings and heating systems in Darmstadt

BUILT BEFORE 1979

70,0 %

24.524 Buildings with living space, of which this share was built before the first Thermal Insulation Ordinance (Wärmeschutzverordnung)
GAS HEATING

72,7 %

85.418 Homes, of which this share are heated with gas
HEATING OIL

6,5 %

Share of homes with oil heating
DISTRICT HEATING

14,6 %

Share of homes with district heating

Source: Zensus 2022, Statistische Ämter des Bundes und der Länder – Gemeindeergebnisse Darmstadt (aufbereitet von wahlatlas.net), Reference date 15.05.2022

Heat planning and heating replacement in Darmstadt

What this means for your house

For most Darmstadt houses outside the future heating networks, the way forward is a heat pump. The room-by-room heat load calculation shows which size is suitable and whether the existing radiators are sufficient.

Frequently asked questions from Darmstadt

Is district heating coming to my street in Darmstadt?

The map of the city's heat planning shows this. If not, a heat pump is usually the solution – for this we calculate the heat load of every room.

Do you come to my home for the heat load calculation?

No, that is not necessary. You upload floor plans, sections and photos online – for a house in Darmstadt just as anywhere else in Germany. If anything is missing, we ask for it specifically.

How quickly will I receive the result?

You receive your quote within a few minutes. We deliver the expert-checked result within 2 days of our confirmation that the required documents are complete.

Is the calculation sufficient for KfW funding?

Yes. The room-by-room heat load calculation according to DIN EN 12831-1 and hydraulic balancing according to procedure B are the evidence required for heat pump funding.