Heizlastprofi
BAD KREUZNACH · RHINELAND-PALATINATE

Heat load calculation in Bad Kreuznach

Bad Kreuznach has no heating network so far – natural gas and heating oil cover over 94 % of heat. The heat plan is even examining the warm brine springs as an energy source. For most houses, their own heat pump remains the most important route.

Buildings and heating systems in Bad Kreuznach

BUILT BEFORE 1979

64,3 %

10.918 Buildings with living space, of which this share was built before the first Thermal Insulation Ordinance (Wärmeschutzverordnung)
GAS HEATING

74,7 %

28.496 Homes, of which this share are heated with gas
HEATING OIL

13,8 %

Share of homes with oil heating
DISTRICT HEATING

3,0 %

Share of homes with district heating

Source: Zensus 2022, Statistische Ämter des Bundes und der Länder – Gemeindeergebnisse Bad Kreuznach (aufbereitet von wahlatlas.net), Reference date 15.05.2022

Heat planning and heating replacement in Bad Kreuznach

What this means for your house

Without a heating network, the heat pump is the solution for most houses – which heat source is permitted depends on the district. The room-by-room heat load shows what output your house really needs.

Frequently asked questions from Bad Kreuznach

Can I install a groundwater heat pump in Bad Münster am Stein?

Applications there are mostly rejected. An air-source heat pump is usually the alternative; the heat load calculation shows the right size.

Do you come to my home for the heat load calculation?

No, that is not necessary. You upload floor plans, sections and photos online – for a house in Bad Kreuznach just as anywhere else in Germany. If anything is missing, we ask for it specifically.

How quickly will I receive the result?

You receive your quote within a few minutes. We deliver the expert-checked result within 2 days of our confirmation that the required documents are complete.

Is the calculation sufficient for KfW funding?

Yes. The room-by-room heat load calculation according to DIN EN 12831-1 and hydraulic balancing according to procedure B are the evidence required for heat pump funding.