Heizlastprofi
NEUSTADT AN DER WEINSTRASSE · RHINELAND-PALATINATE

Heat load calculation in Neustadt an der Weinstraße

In Neustadt an der Weinstraße, a good four in five homes heat with gas, and around one in six residential buildings dates from before 1919. According to the heat plan, a good half of the heat demand will continue to be met in the individual house in future.

Buildings and heating systems in Neustadt a. d. Weinstraße

BUILT BEFORE 1979

68,4 %

14.237 Buildings with living space, of which this share was built before the first Thermal Insulation Ordinance (Wärmeschutzverordnung)
GAS HEATING

80,3 %

28.093 Homes, of which this share are heated with gas
HEATING OIL

7,6 %

Share of homes with oil heating
DISTRICT HEATING

6,8 %

Share of homes with district heating

Source: Zensus 2022, Statistische Ämter des Bundes und der Länder – Gemeindeergebnisse Neustadt an der Weinstraße (aufbereitet von wahlatlas.net), Reference date 15.05.2022

Heat planning and heating replacement in Neustadt a. d. Weinstraße

What this means for your house

If your house is in one of the decentrally supplied areas, the heat pump is usually the solution. The room-by-room heat load calculation shows the output required – for winemakers' houses and old buildings too.

Frequently asked questions from Neustadt a. d. Weinstraße

Will there be a heating network in my district of Neustadt?

This is shown in the area profiles of the heat plan on neustadt.eu. For decentrally supplied houses, we calculate the heat load for a heat pump.

Do you come to my home for the heat load calculation?

No, that is not necessary. You upload floor plans, sections and photos online – for a house in Neustadt a. d. Weinstraße just as anywhere else in Germany. If anything is missing, we ask for it specifically.

How quickly will I receive the result?

You receive your quote within a few minutes. We deliver the expert-checked result within 2 days of our confirmation that the required documents are complete.

Is the calculation sufficient for KfW funding?

Yes. The room-by-room heat load calculation according to DIN EN 12831-1 and hydraulic balancing according to procedure B are the evidence required for heat pump funding.