Heizlastprofi
SPEYER · RHINELAND-PALATINATE

Heat load calculation in Speyer

Speyer has been receiving district heating via its own pipeline from Mannheim since 2010, yet just under 70 % of homes are heated with gas. Since June 2026, the city has been preparing its heat plan with the goal of climate neutrality by 2040.

Buildings and heating systems in Speyer

BUILT BEFORE 1979

66,6 %

10.404 Buildings with living space, of which this share was built before the first Thermal Insulation Ordinance (Wärmeschutzverordnung)
GAS HEATING

69,3 %

26.309 Homes, of which this share are heated with gas
HEATING OIL

9,6 %

Share of homes with oil heating
DISTRICT HEATING

17,2 %

Share of homes with district heating

Source: Zensus 2022, Statistische Ämter des Bundes und der Länder – Gemeindeergebnisse Speyer (aufbereitet von wahlatlas.net), Reference date 15.05.2022

Heat planning and heating replacement in Speyer

What this means for your house

Outside the district heating areas, a heat pump is usually the solution for an older house in Speyer. The room-by-room heat load calculation shows what output is needed and whether the radiators are sufficient.

Frequently asked questions from Speyer

Can I connect to district heating in Speyer?

That depends on your street; Stadtwerke Speyer GmbH can provide information. Without district heating, we calculate the heat load for your heat pump.

Do you come to my home for the heat load calculation?

No, that is not necessary. You upload floor plans, sections and photos online – for a house in Speyer just as anywhere else in Germany. If anything is missing, we ask for it specifically.

How quickly will I receive the result?

You receive your quote within a few minutes. We deliver the expert-checked result within 2 days of our confirmation that the required documents are complete.

Is the calculation sufficient for KfW funding?

Yes. The room-by-room heat load calculation according to DIN EN 12831-1 and hydraulic balancing according to procedure B are the evidence required for heat pump funding.

Sources

All information about the city is publicly available data from the bodies named (retrieved on 18.11.2026). The city and the energy supplier decide on connection to a heating network; the heat load calculation itself applies to your building regardless.

More cities in Rhineland-Palatinate

Heat load calculation in Bad Kreuznach · Heat load calculation in Kaiserslautern · Heat load calculation in Koblenz · Heat load calculation in Ludwigshafen · Heat load calculation in Mainz · Heat load calculation in Neustadt a. d. Weinstraße · Heat load calculation in Neuwied · Heat load calculation in Trier · Heat load calculation in Worms · All cities