Heizlastprofi
TRIER · RHINELAND-PALATINATE

Heat load calculation in Trier

Trier adopted its heat plan in May 2025, more than a year before the legal deadline. The city is divided into heating network, biomethane and decentralised areas – in the decentralised areas, heating is to be provided mainly by heat pumps.

Buildings and heating systems in Trier

BUILT BEFORE 1979

68,9 %

21.286 Buildings with living space, of which this share was built before the first Thermal Insulation Ordinance (Wärmeschutzverordnung)
GAS HEATING

60,6 %

62.985 Homes, of which this share are heated with gas
HEATING OIL

20,7 %

Share of homes with oil heating
DISTRICT HEATING

4,3 %

Share of homes with district heating

Source: Zensus 2022, Statistische Ämter des Bundes und der Länder – Gemeindeergebnisse Trier (aufbereitet von wahlatlas.net), Reference date 15.05.2022

Heat planning and heating replacement in Trier

What this means for your house

If your house is in a decentralised area, the heat pump is the intended route. The room-by-room heat load calculation shows which heat source and which output suit your house.

Frequently asked questions from Trier

My house is in Ehrang – do I need a heat pump?

For Ehrang-Quint, the plan provides for converting the gas network to biomethane. If you still want to opt for a heat pump, plan it with the heat load calculation.

Do you come to my home for the heat load calculation?

No, that is not necessary. You upload floor plans, sections and photos online – for a house in Trier just as anywhere else in Germany. If anything is missing, we ask for it specifically.

How quickly will I receive the result?

You receive your quote within a few minutes. We deliver the expert-checked result within 2 days of our confirmation that the required documents are complete.

Is the calculation sufficient for KfW funding?

Yes. The room-by-room heat load calculation according to DIN EN 12831-1 and hydraulic balancing according to procedure B are the evidence required for heat pump funding.

Sources

All information about the city is publicly available data from the bodies named (retrieved on 18.11.2026). The city and the energy supplier decide on connection to a heating network; the heat load calculation itself applies to your building regardless.

More cities in Rhineland-Palatinate

Heat load calculation in Bad Kreuznach · Heat load calculation in Kaiserslautern · Heat load calculation in Koblenz · Heat load calculation in Ludwigshafen · Heat load calculation in Mainz · Heat load calculation in Neustadt a. d. Weinstraße · Heat load calculation in Neuwied · Heat load calculation in Speyer · Heat load calculation in Worms · All cities