Heizlastprofi
LUDWIGSHAFEN AM RHEIN · RHINELAND-PALATINATE

Heat load calculation in Ludwigshafen am Rhein

In Ludwigshafen, a good two thirds of homes are heated with gas, and around 70 % of residential buildings date from before 1979. For the districts without a major district heating expansion, the heat plan mainly envisages heat pumps.

Buildings and heating systems in Ludwigshafen

BUILT BEFORE 1979

70,9 %

28.228 Buildings with living space, of which this share was built before the first Thermal Insulation Ordinance (Wärmeschutzverordnung)
GAS HEATING

67,8 %

86.264 Homes, of which this share are heated with gas
HEATING OIL

8,4 %

Share of homes with oil heating
DISTRICT HEATING

21,0 %

Share of homes with district heating

Source: Zensus 2022, Statistische Ämter des Bundes und der Länder – Gemeindeergebnisse Ludwigshafen am Rhein (aufbereitet von wahlatlas.net), Reference date 15.05.2022

Heat planning and heating replacement in Ludwigshafen

What this means for your house

In Oggersheim, Gartenstadt or Mundenheim, district heating will only arrive later according to the plan, and in many other locations not at all. For a gas-heated house from before 1979, the room-by-room heat load is the first step: it shows which heat pump is suitable and which radiators should be replaced.

Frequently asked questions from Ludwigshafen

Will my district get district heating soon?

The city's heat plan answers this with its expansion areas. If your house is outside them, a heat pump is usually the solution – the heat load calculation is the basis for its size and the funding application.

Do you come to my home for the heat load calculation?

No, that is not necessary. You upload floor plans, sections and photos online – for a house in Ludwigshafen just as anywhere else in Germany. If anything is missing, we ask for it specifically.

How quickly will I receive the result?

You receive your quote within a few minutes. We deliver the expert-checked result within 2 days of our confirmation that the required documents are complete.

Is the calculation sufficient for KfW funding?

Yes. The room-by-room heat load calculation according to DIN EN 12831-1 and hydraulic balancing according to procedure B are the evidence required for heat pump funding.