Heizlastprofi
WORMS · RHINELAND-PALATINATE

Heat load calculation in Worms

In Worms, just under 90 % of heating systems run on oil or gas, many of them for more than 20 years. The city has been working on its heat plan since the end of 2025 – if you need to replace your heating before then, it is best to plan with an accurate heat load.

Buildings and heating systems in Worms

BUILT BEFORE 1979

67,7 %

19.657 Buildings with living space, of which this share was built before the first Thermal Insulation Ordinance (Wärmeschutzverordnung)
GAS HEATING

71,9 %

44.009 Homes, of which this share are heated with gas
HEATING OIL

18,7 %

Share of homes with oil heating
DISTRICT HEATING

3,8 %

Share of homes with district heating

Source: Zensus 2022, Statistische Ämter des Bundes und der Länder – Gemeindeergebnisse Worms (aufbereitet von wahlatlas.net), Reference date 15.05.2022

Heat planning and heating replacement in Worms

What this means for your house

If your oil or gas heating is due for replacement, you do not have to wait for the heat plan. The room-by-room heat load calculation shows whether a heat pump is suitable and how large it needs to be – and it is a requirement for KfW funding.

Frequently asked questions from Worms

Should I wait for the heat plan in Worms?

If your heating is still running well, you can wait. If it has to be replaced before then, the heat load calculation is the safe first step – it applies regardless of which heating system comes later.

Do you come to my home for the heat load calculation?

No, that is not necessary. You upload floor plans, sections and photos online – for a house in Worms just as anywhere else in Germany. If anything is missing, we ask for it specifically.

How quickly will I receive the result?

You receive your quote within a few minutes. We deliver the expert-checked result within 2 days of our confirmation that the required documents are complete.

Is the calculation sufficient for KfW funding?

Yes. The room-by-room heat load calculation according to DIN EN 12831-1 and hydraulic balancing according to procedure B are the evidence required for heat pump funding.

Sources

All information about the city is publicly available data from the bodies named (retrieved on 18.11.2026). The city and the energy supplier decide on connection to a heating network; the heat load calculation itself applies to your building regardless.

More cities in Rhineland-Palatinate

Heat load calculation in Bad Kreuznach · Heat load calculation in Kaiserslautern · Heat load calculation in Koblenz · Heat load calculation in Ludwigshafen · Heat load calculation in Mainz · Heat load calculation in Neustadt a. d. Weinstraße · Heat load calculation in Neuwied · Heat load calculation in Speyer · Heat load calculation in Trier · All cities