Heizlastprofi
CELLE · LOWER SAXONY

Heat load calculation in Celle

In Celle, 72.9 % of buildings with living space date from before 1979, and 80.6 % of homes are heated with gas. The municipal heat plan shows where a heating network is being examined – mainly around the old town – and where houses need their own solution. For the heat pump, the room-by-room heat load is the basis.

Buildings and heating systems in Celle

BUILT BEFORE 1979

72,9 %

19.962 Buildings with living space, of which this share was built before the first Thermal Insulation Ordinance (Wärmeschutzverordnung)
GAS HEATING

80,6 %

36.639 Homes, of which this share are heated with gas
HEATING OIL

12,1 %

Share of homes with oil heating
DISTRICT HEATING

2,5 %

Share of homes with district heating

Source: Zensus 2022, Statistische Ämter des Bundes und der Länder – Gemeindeergebnisse Celle (aufbereitet von wahlatlas.net), Reference date 15.05.2022

Heat planning and heating replacement in Celle

What this means for your house

If your house is outside the Altstadt focus area and the areas under review, a heat pump is usually an option according to the heat plan. The room-by-room heat load calculation shows what output is required and whether your radiators are suitable – and it is helpful for funding applications to the federal government and the climate protection fund (Klimaschutzfonds).

Frequently asked questions from Celle

Will Celle's old town be connected to a heating network?

For the Altstadt focus area, the heat plan initially envisages a feasibility study; whether and when a network will be built is therefore not yet certain. For houses outside these areas, we calculate the heat load for a heat pump.

Do you come to my home for the heat load calculation?

No, that is not necessary. You upload floor plans, sections and photos online – for a house in Celle just as anywhere else in Germany. If anything is missing, we ask for it specifically.

How quickly will I receive the result?

You receive your quote within a few minutes. We deliver the expert-checked result within 2 days of our confirmation that the required documents are complete.

Is the calculation sufficient for KfW funding?

Yes. The room-by-room heat load calculation according to DIN EN 12831-1 and hydraulic balancing according to procedure B are the evidence required for heat pump funding.