Heat load calculation in Garbsen

In Garbsen, 57.1 % of buildings with living space date from before 1979 – most of them from 1949 to 1978 – and 73.5 % of homes are heated with gas. The municipal heat plan shows where local heating networks are being examined and where houses need their own solution. For the heat pump, the room-by-room heat load is the basis.

Buildings and heating systems in Garbsen

BUILT BEFORE 1979

57,1 %

13.995 Buildings with living space, of which this share was built before the first Thermal Insulation Ordinance (Wärmeschutzverordnung)
GAS HEATING

73,5 %

30.306 Homes, of which this share are heated with gas
HEATING OIL

15,0 %

Share of homes with oil heating
DISTRICT HEATING

8,1 %

Share of homes with district heating

Source: Zensus 2022, Statistische Ämter des Bundes und der Länder – Gemeindeergebnisse Garbsen (aufbereitet von wahlatlas.net), Reference date 15.05.2022

Heat planning and heating replacement in Garbsen

What this means for your house

If your house is outside the suitable areas of Berenbostel and Auf der Horst, it is expected to be heated in a decentralised way according to the heat plan – usually with a heat pump. The room-by-room heat load calculation shows what output is required and whether your radiators are suitable – and it is also helpful for the funding application.

Frequently asked questions from Garbsen

Will my district of Garbsen get a local heating network?

In Berenbostel and Auf der Horst, feasibility studies are to examine whether it can be implemented; in the areas under review such as Osterwald or Holtyplatz, only in the longer term. For houses outside these areas, we calculate the heat load for a heat pump.

Do you come to my home for the heat load calculation?

No, that is not necessary. You upload floor plans, sections and photos online – for a house in Garbsen just as anywhere else in Germany. If anything is missing, we ask for it specifically.

How quickly will I receive the result?

You receive your quote within a few minutes. We deliver the expert-checked result within 2 days of our confirmation that the required documents are complete.

Is the calculation sufficient for KfW funding?

Yes. The room-by-room heat load calculation according to DIN EN 12831-1 and hydraulic balancing according to procedure B are the evidence required for heat pump funding.