Heizlastprofi
LANGENHAGEN · LOWER SAXONY

Heat load calculation in Langenhagen

In Langenhagen, 50.2 % of buildings with living space date from 1949 to 1978, and 74.6 % of homes are heated with gas. The city is working on a heat plan for a greenhouse-gas-neutral heat supply by 2040; apart from EPL's networks, many houses will remain with their own solution. For the heat pump, the room-by-room heat load calculation is the basis.

Buildings and heating systems in Langenhagen

BUILT BEFORE 1979

59,0 %

11.768 Buildings with living space, of which this share was built before the first Thermal Insulation Ordinance (Wärmeschutzverordnung)
GAS HEATING

74,6 %

27.694 Homes, of which this share are heated with gas
HEATING OIL

9,7 %

Share of homes with oil heating
DISTRICT HEATING

12,1 %

Share of homes with district heating

Source: Zensus 2022, Statistische Ämter des Bundes und der Länder – Gemeindeergebnisse Langenhagen (aufbereitet von wahlatlas.net), Reference date 15.05.2022

Heat planning and heating replacement in Langenhagen

What this means for your house

If your house is not on one of EPL's networks, a heat pump is usually an option in Langenhagen – the heat plan does not provide for any connection obligation. The room-by-room heat load calculation shows what output is required and whether your radiators are sufficient; you need it for funding anyway.

Frequently asked questions from Langenhagen

Do I have to connect to a heating network in Langenhagen?

According to the city, no heat bylaw area is being adopted with the heat planning; owners can choose between a connection and their own solution. For a heat pump, we calculate the heat load of your house room by room.

Do you come to my home for the heat load calculation?

No, that is not necessary. You upload floor plans, sections and photos online – for a house in Langenhagen just as anywhere else in Germany. If anything is missing, we ask for it specifically.

How quickly will I receive the result?

You receive your quote within a few minutes. We deliver the expert-checked result within 2 days of our confirmation that the required documents are complete.

Is the calculation sufficient for KfW funding?

Yes. The room-by-room heat load calculation according to DIN EN 12831-1 and hydraulic balancing according to procedure B are the evidence required for heat pump funding.