Heizlastprofi
DELMENHORST · LOWER SAXONY

Heat load calculation in Delmenhorst

In Delmenhorst, 89.5 % of homes are heated with gas, and 63.7 % of buildings with living space date from before 1979. The municipal heat plan shows where heating networks are an option and where individual solutions such as heat pumps are a better fit. For the heat pump, the room-by-room heat load is the basis.

Buildings and heating systems in Delmenhorst

BUILT BEFORE 1979

63,7 %

22.111 Buildings with living space, of which this share was built before the first Thermal Insulation Ordinance (Wärmeschutzverordnung)
GAS HEATING

89,5 %

40.065 Homes, of which this share are heated with gas
HEATING OIL

4,1 %

Share of homes with oil heating
DISTRICT HEATING

3,4 %

Share of homes with district heating

Source: Zensus 2022, Statistische Ämter des Bundes und der Länder – Gemeindeergebnisse Delmenhorst (aufbereitet von wahlatlas.net), Reference date 15.05.2022

Heat planning and heating replacement in Delmenhorst

What this means for your house

If your house is outside the densely built-up areas such as Stadtmitte, Stickgras/Annenheide or Hasport/Annenheide, the heat plan tends to envisage an individual solution such as a heat pump. The room-by-room heat load calculation shows what output is required and whether your radiators are suitable – and it is also helpful for the funding application.

Frequently asked questions from Delmenhorst

Will my district of Delmenhorst get district heating?

The heat plan names areas that could be suitable for heating networks and initially recommends feasibility studies there – this is not a commitment to connect. For houses outside these areas, we calculate the heat load for a heat pump.

Do you come to my home for the heat load calculation?

No, that is not necessary. You upload floor plans, sections and photos online – for a house in Delmenhorst just as anywhere else in Germany. If anything is missing, we ask for it specifically.

How quickly will I receive the result?

You receive your quote within a few minutes. We deliver the expert-checked result within 2 days of our confirmation that the required documents are complete.

Is the calculation sufficient for KfW funding?

Yes. The room-by-room heat load calculation according to DIN EN 12831-1 and hydraulic balancing according to procedure B are the evidence required for heat pump funding.