Heizlastprofi
HAMELIN · LOWER SAXONY

Heat load calculation in Hamelin

In Hamelin, 71.8 % of buildings with living space were built before 1979, and 73.1 % of homes are heated with gas. The municipal heat plan shows where heating networks are an option and where houses need their own solution. For the heat pump, the room-by-room heat load calculation is the basis.

Buildings and heating systems in Hamelin

BUILT BEFORE 1979

71,8 %

14.377 Buildings with living space, of which this share was built before the first Thermal Insulation Ordinance (Wärmeschutzverordnung)
GAS HEATING

73,1 %

31.937 Homes, of which this share are heated with gas
HEATING OIL

9,4 %

Share of homes with oil heating
DISTRICT HEATING

13,4 %

Share of homes with district heating

Source: Zensus 2022, Statistische Ämter des Bundes und der Länder – Gemeindeergebnisse Hameln (aufbereitet von wahlatlas.net), Reference date 15.05.2022

Heat planning and heating replacement in Hamelin

What this means for your house

If your house is outside the Enertec district heating network and not in the area under review in the Nordstadt, a heat pump is usually an option. The room-by-room heat load calculation shows what output is required and whether your radiators are sufficient – you need it for funding anyway.

Frequently asked questions from Hamelin

Do I have to replace my heating in Hamelin now because of the heat plan?

According to the municipal utility, the heat plan does not create any acute pressure to act; it serves as an initial planning basis. If you are considering a heat pump, we calculate the heat load of your house room by room.

Do you come to my home for the heat load calculation?

No, that is not necessary. You upload floor plans, sections and photos online – for a house in Hamelin just as anywhere else in Germany. If anything is missing, we ask for it specifically.

How quickly will I receive the result?

You receive your quote within a few minutes. We deliver the expert-checked result within 2 days of our confirmation that the required documents are complete.

Is the calculation sufficient for KfW funding?

Yes. The room-by-room heat load calculation according to DIN EN 12831-1 and hydraulic balancing according to procedure B are the evidence required for heat pump funding.