Heizlastprofi
WOLFSBURG · LOWER SAXONY

Heat load calculation in Wolfsburg

In Wolfsburg, 81.2 % of homes are heated with district heating – gas plays only a small role at 6.9 %. Anyone living in the outskirts or outer localities usually needs their own solution. For the heat pump, the room-by-room heat load calculation is the basis.

Buildings and heating systems in Wolfsburg

BUILT BEFORE 1979

54,9 %

28.462 Buildings with living space, of which this share was built before the first Thermal Insulation Ordinance (Wärmeschutzverordnung)
GAS HEATING

6,9 %

68.329 Homes, of which this share are heated with gas
HEATING OIL

7,3 %

Share of homes with oil heating
DISTRICT HEATING

81,2 %

Share of homes with district heating

Source: Zensus 2022, Statistische Ämter des Bundes und der Länder – Gemeindeergebnisse Wolfsburg (aufbereitet von wahlatlas.net), Reference date 15.05.2022

Heat planning and heating replacement in Wolfsburg

What this means for your house

If your house is outside the district heating network, for example in Hehlingen or another outer locality, a heat pump is usually an option; for geothermal boreholes, the heat plan requires a preliminary geological investigation because of possible sulphate and anhydrite deposits. The room-by-room heat load calculation shows what output is required and whether your radiators are sufficient – you need it for funding anyway.

Frequently asked questions from Wolfsburg

Will my locality in Wolfsburg get district heating?

The heat plan's area classification shows this: heating network areas are mainly within the existing network and adjoining areas, while Heinenkamp and parts of Heiligendorf are areas under review. In the outskirts and outer localities, mainly decentralised supply is envisaged; there we calculate the heat load for a heat pump.

Do you come to my home for the heat load calculation?

No, that is not necessary. You upload floor plans, sections and photos online – for a house in Wolfsburg just as anywhere else in Germany. If anything is missing, we ask for it specifically.

How quickly will I receive the result?

You receive your quote within a few minutes. We deliver the expert-checked result within 2 days of our confirmation that the required documents are complete.

Is the calculation sufficient for KfW funding?

Yes. The room-by-room heat load calculation according to DIN EN 12831-1 and hydraulic balancing according to procedure B are the evidence required for heat pump funding.

Sources

All information about the city is publicly available data from the bodies named (retrieved on 19.11.2026). The city and the energy supplier decide on connection to a heating network; the heat load calculation itself applies to your building regardless.

More cities in Lower Saxony

Heat load calculation in Brunswick · Heat load calculation in Celle · Heat load calculation in Delmenhorst · Heat load calculation in Garbsen · Heat load calculation in Göttingen · Heat load calculation in Hamelin · Heat load calculation in Hanover · Heat load calculation in Hildesheim · Heat load calculation in Langenhagen · Heat load calculation in Lingen · Heat load calculation in Lüneburg · Heat load calculation in Nordhorn · Heat load calculation in Oldenburg · Heat load calculation in Osnabrück · Heat load calculation in Peine · Heat load calculation in Salzgitter · Heat load calculation in Wilhelmshaven · Heat load calculation in Wolfenbüttel · All cities