Heizlastprofi
AUGSBURG · BAVARIA

Heat load calculation in Augsburg

In Augsburg, 63.2 % of homes are heated with gas, and only 19.2 % are connected to district heating. The city's 2026 heat plan shows where heating networks are to grow and where buildings need their own solutions. For a heat pump, the room-by-room heat load calculation is the basis.

Buildings and heating systems in Augsburg

BUILT BEFORE 1979

66,4 %

39.439 Buildings with living space, of which this share was built before the first Thermal Insulation Ordinance (Wärmeschutzverordnung)
GAS HEATING

63,2 %

162.407 Homes, of which this share are heated with gas
HEATING OIL

11,8 %

Share of homes with oil heating
DISTRICT HEATING

19,2 %

Share of homes with district heating

Source: Zensus 2022, Statistische Ämter des Bundes und der Länder – Gemeindeergebnisse Augsburg (aufbereitet von wahlatlas.net), Reference date 15.05.2022

Heat planning and heating replacement in Augsburg

What this means for your house

Augsburg's heat plan often sees detached and terraced houses supplied in a decentralised way, and larger blocks of flats via district heating. If your house is outside the heating network areas, the room-by-room heat load calculation shows which heat pump is suitable and whether your radiators are sufficient – and it is part of the funding documents.

Frequently asked questions from Augsburg

Can I use a groundwater heat pump in Augsburg?

The heat plan designates suitable areas for groundwater heat pumps and excludes mineral spring areas and drinking water catchment areas; a water-law permit is also required in each individual case. The room-by-room heat load is the basis for sizing any heat pump.

Do you come to my home for the heat load calculation?

No, that is not necessary. You upload floor plans, sections and photos online – for a house in Augsburg just as anywhere else in Germany. If anything is missing, we ask for it specifically.

How quickly will I receive the result?

You receive your quote within a few minutes. We deliver the expert-checked result within 2 days of our confirmation that the required documents are complete.

Is the calculation sufficient for KfW funding?

Yes. The room-by-room heat load calculation according to DIN EN 12831-1 and hydraulic balancing according to procedure B are the evidence required for heat pump funding.