Heizlastprofi
KEMPTEN (ALLGÄU) · BAVARIA

Heat load calculation in Kempten (Allgäu)

In Kempten, 26.1 % of homes are heated with district heating, but more than half still with gas; 59.1 % of residential buildings date from before 1979. The municipal heat plan envisages more than 60 per cent of buildings being supplied by heat pumps in 2035. For the heat pump, the room-by-room heat load is the basis.

Buildings and heating systems in Kempten

BUILT BEFORE 1979

59,1 %

10.985 Buildings with living space, of which this share was built before the first Thermal Insulation Ordinance (Wärmeschutzverordnung)
GAS HEATING

56,2 %

36.111 Homes, of which this share are heated with gas
HEATING OIL

10,7 %

Share of homes with oil heating
DISTRICT HEATING

26,1 %

Share of homes with district heating

Source: Zensus 2022, Statistische Ämter des Bundes und der Länder – Gemeindeergebnisse Kempten (Allgäu) (aufbereitet von wahlatlas.net), Reference date 15.05.2022

Heat planning and heating replacement in Kempten

What this means for your house

According to the heat plan, the district heating share is only to rise from twelve to 16 per cent of buildings; before any expansion in a neighbourhood, an economic viability check is carried out, as most recently on the Lindenberg. For most houses, this leaves the heat pump – the room-by-room heat load calculation shows what output is required and whether your radiators are sufficient.

Frequently asked questions from Kempten

Will my neighbourhood in Kempten get district heating?

According to the heat plan, 16 per cent of buildings are to be connected to the district heating network by 2035, compared with twelve per cent today; where an expansion is planned, its economic viability is checked first. For houses outside these areas, we calculate the heat load for a heat pump.

Do you come to my home for the heat load calculation?

No, that is not necessary. You upload floor plans, sections and photos online – for a house in Kempten just as anywhere else in Germany. If anything is missing, we ask for it specifically.

How quickly will I receive the result?

You receive your quote within a few minutes. We deliver the expert-checked result within 2 days of our confirmation that the required documents are complete.

Is the calculation sufficient for KfW funding?

Yes. The room-by-room heat load calculation according to DIN EN 12831-1 and hydraulic balancing according to procedure B are the evidence required for heat pump funding.