Heat load calculation in Landshut

In Landshut, 64.6 % of homes are heated with gas and 17 % with heating oil; district heating accounts for 9.3 %. The city is working on its municipal heat planning, which must be completed by June 2028. For a house outside the heating networks, the room-by-room heat load is the basis for planning a heat pump.

Buildings and heating systems in Landshut

BUILT BEFORE 1979

51,6 %

13.843 Buildings with living space, of which this share was built before the first Thermal Insulation Ordinance (Wärmeschutzverordnung)
GAS HEATING

64,6 %

37.989 Homes, of which this share are heated with gas
HEATING OIL

17,0 %

Share of homes with oil heating
DISTRICT HEATING

9,3 %

Share of homes with district heating

Source: Zensus 2022, Statistische Ämter des Bundes und der Länder – Gemeindeergebnisse Landshut (aufbereitet von wahlatlas.net), Reference date 15.05.2022

Heat planning and heating replacement in Landshut

What this means for your house

As long as the heat plan is not available and your house is not on the Fernwärme Ost or West district heating network, a heat pump is usually an option – although without the use of groundwater in Münchnerau-Siebensee and Wolfsteinerau. The room-by-room heat load calculation shows what output is required and whether your radiators are sufficient; you need it for funding anyway.

Frequently asked questions from Landshut

May I install a groundwater heat pump in Landshut?

Not in the drinking water protection areas Münchnerau-Siebensee and Wolfsteinerau; in the rest of the city area only with a water-law permit and only from near-surface groundwater. Regardless of the heat source, we calculate the room-by-room heat load on which the heat pump is sized.

Do you come to my home for the heat load calculation?

No, that is not necessary. You upload floor plans, sections and photos online – for a house in Landshut just as anywhere else in Germany. If anything is missing, we ask for it specifically.

How quickly will I receive the result?

You receive your quote within a few minutes. We deliver the expert-checked result within 2 days of our confirmation that the required documents are complete.

Is the calculation sufficient for KfW funding?

Yes. The room-by-room heat load calculation according to DIN EN 12831-1 and hydraulic balancing according to procedure B are the evidence required for heat pump funding.