Heizlastprofi
NUREMBERG · BAVARIA

Heat load calculation in Nuremberg

In Nuremberg, 70.1 % of residential buildings were built before 1979, and 56 % of homes are heated with gas. The city's heat planning envisages district heating mainly in densely built-up areas and decentralised solutions such as heat pumps in the other districts. Their basis is the room-by-room heat load calculation.

Buildings and heating systems in Nuremberg

BUILT BEFORE 1979

70,1 %

73.805 Buildings with living space, of which this share was built before the first Thermal Insulation Ordinance (Wärmeschutzverordnung)
GAS HEATING

56,0 %

283.757 Homes, of which this share are heated with gas
HEATING OIL

11,6 %

Share of homes with oil heating
DISTRICT HEATING

27,9 %

Share of homes with district heating

Source: Zensus 2022, Statistische Ämter des Bundes und der Länder – Gemeindeergebnisse Nürnberg (aufbereitet von wahlatlas.net), Reference date 15.05.2022

Heat planning and heating replacement in Nuremberg

What this means for your house

Outside the city centre and the district heating expansion areas, Nuremberg's heat planning relies on decentralised solutions such as heat pumps. The room-by-room heat load calculation shows what output your house needs and whether the existing radiators are sufficient – and it is one of the documents required for funding.

Frequently asked questions from Nuremberg

Will district heating come to my district of Nuremberg?

The city's map of heat supply areas and N-Ergie's expansion map show this; according to the city, whether and when an area is connected depends on demand, funding, local conditions and road works. For houses outside the expansion areas, we calculate the heat load room by room for a heat pump.

Do you come to my home for the heat load calculation?

No, that is not necessary. You upload floor plans, sections and photos online – for a house in Nuremberg just as anywhere else in Germany. If anything is missing, we ask for it specifically.

How quickly will I receive the result?

You receive your quote within a few minutes. We deliver the expert-checked result within 2 days of our confirmation that the required documents are complete.

Is the calculation sufficient for KfW funding?

Yes. The room-by-room heat load calculation according to DIN EN 12831-1 and hydraulic balancing according to procedure B are the evidence required for heat pump funding.