Heizlastprofi
PASSAU · BAVARIA

Heat load calculation in Passau

In Passau, 64.8 % of homes are heated with gas and 23.2 % with heating oil, while district heating accounts for only 3 %. The draft heat plan envisages heating networks mainly in the dense city centre and rather decentralised solutions such as heat pumps in the loosely built-up localities. For heat pumps, the room-by-room heat load calculation is the basis.

Buildings and heating systems in Passau

BUILT BEFORE 1979

58,7 %

11.101 Buildings with living space, of which this share was built before the first Thermal Insulation Ordinance (Wärmeschutzverordnung)
GAS HEATING

64,8 %

33.158 Homes, of which this share are heated with gas
HEATING OIL

23,2 %

Share of homes with oil heating
DISTRICT HEATING

3,0 %

Share of homes with district heating

Source: Zensus 2022, Statistische Ämter des Bundes und der Länder – Gemeindeergebnisse Passau (aufbereitet von wahlatlas.net), Reference date 15.05.2022

Heat planning and heating replacement in Passau

What this means for your house

In the village-like localities, the suitability check is expected to envisage decentralised supply – an air-source heat pump is then usually the obvious way forward. The room-by-room heat load calculation shows what output your house needs and whether the existing radiators are sufficient.

Frequently asked questions from Passau

Will my locality in Passau be connected to a heating network?

According to the suitability check, areas with standard heat planning are mainly in the city centre, while village-like localities are expected to be areas for decentralised supply. The maps in the city's geoportal show which classification applies to your sub-area; the city has not yet published the final version of the heat plan.

Do you come to my home for the heat load calculation?

No, that is not necessary. You upload floor plans, sections and photos online – for a house in Passau just as anywhere else in Germany. If anything is missing, we ask for it specifically.

How quickly will I receive the result?

You receive your quote within a few minutes. We deliver the expert-checked result within 2 days of our confirmation that the required documents are complete.

Is the calculation sufficient for KfW funding?

Yes. The room-by-room heat load calculation according to DIN EN 12831-1 and hydraulic balancing according to procedure B are the evidence required for heat pump funding.