Heizlastprofi
MUNICH · BAVARIA

Heat load calculation in Munich

In Munich, 32.7 % of homes are heated with district heating and 50.3 % still with gas – and just under 60 % of residential buildings date from before 1979. The city's heat plan shows which areas are earmarked for heating networks and where houses will be supplied in a decentralised way. For a heat pump, the room-by-room heat load calculation is the basis.

Buildings and heating systems in Munich

BUILT BEFORE 1979

59,7 %

147.196 Buildings with living space, of which this share was built before the first Thermal Insulation Ordinance (Wärmeschutzverordnung)
GAS HEATING

50,3 %

824.103 Homes, of which this share are heated with gas
HEATING OIL

9,7 %

Share of homes with oil heating
DISTRICT HEATING

32,7 %

Share of homes with district heating

Source: Zensus 2022, Statistische Ämter des Bundes und der Länder – Gemeindeergebnisse München (aufbereitet von wahlatlas.net), Reference date 15.05.2022

Heat planning and heating replacement in Munich

What this means for your house

If your house is in an area for decentralised supply or in an area under review, a heat pump – in the Munich area also using groundwater or geothermal energy – is the obvious solution. The room-by-room heat load calculation shows the output required and whether your radiators are suitable; you need reliable planning documents for federal and municipal funding anyway.

Frequently asked questions from Munich

Is my house in Munich in a district heating area?

The map of heat supply areas in the city's geoportal shows this; it is generally updated once a year. If your house is outside the heating network areas, we calculate the heat load room by room for a heat pump.

Do you come to my home for the heat load calculation?

No, that is not necessary. You upload floor plans, sections and photos online – for a house in Munich just as anywhere else in Germany. If anything is missing, we ask for it specifically.

How quickly will I receive the result?

You receive your quote within a few minutes. We deliver the expert-checked result within 2 days of our confirmation that the required documents are complete.

Is the calculation sufficient for KfW funding?

Yes. The room-by-room heat load calculation according to DIN EN 12831-1 and hydraulic balancing according to procedure B are the evidence required for heat pump funding.