Heizlastprofi
INGOLSTADT · BAVARIA

Heat load calculation in Ingolstadt

In Ingolstadt, 63.3 % of homes are heated with gas and 14.1 % with heating oil; according to the heat planning, only about 13 per cent of buildings are in an area suitable for heating networks. Most houses therefore need their own solution, often a heat pump. Its basis is the room-by-room heat load calculation.

Buildings and heating systems in Ingolstadt

BUILT BEFORE 1979

43,8 %

28.360 Buildings with living space, of which this share was built before the first Thermal Insulation Ordinance (Wärmeschutzverordnung)
GAS HEATING

63,3 %

71.751 Homes, of which this share are heated with gas
HEATING OIL

14,1 %

Share of homes with oil heating
DISTRICT HEATING

14,2 %

Share of homes with district heating

Source: Zensus 2022, Statistische Ämter des Bundes und der Länder – Gemeindeergebnisse Ingolstadt (aufbereitet von wahlatlas.net), Reference date 15.05.2022

Heat planning and heating replacement in Ingolstadt

What this means for your house

If your house is in a gas/heat pump area under review or in an area for individual heating solutions, a heat pump is usually the obvious solution in Ingolstadt. The room-by-room heat load calculation shows what output is required and whether your radiators are sufficient – and it is one of the documents required for funding.

Frequently asked questions from Ingolstadt

Will my district of Ingolstadt get district heating?

The heat planning map on 2035.de shows the areas suitable for heating networks; the municipal utility is currently examining Dachsberg, Samhof, Friedrich-Ebert-Straße and the Monikaviertel, among others. If your house is outside these areas, we calculate the heat load room by room for a heat pump.

Do you come to my home for the heat load calculation?

No, that is not necessary. You upload floor plans, sections and photos online – for a house in Ingolstadt just as anywhere else in Germany. If anything is missing, we ask for it specifically.

How quickly will I receive the result?

You receive your quote within a few minutes. We deliver the expert-checked result within 2 days of our confirmation that the required documents are complete.

Is the calculation sufficient for KfW funding?

Yes. The room-by-room heat load calculation according to DIN EN 12831-1 and hydraulic balancing according to procedure B are the evidence required for heat pump funding.