Heizlastprofi
ROSENHEIM · BAVARIA

Heat load calculation in Rosenheim

In Rosenheim, 36.8 % of homes are heated with district heating, 42.4 % with gas and 13.3 % with heating oil. The city and the municipal utility (Stadtwerke) are jointly drawing up the municipal heat plan, which is to be completed by the end of June 2028. Where no district heating expansion is planned, the room-by-room heat load is the basis for planning a heat pump.

Buildings and heating systems in Rosenheim

BUILT BEFORE 1979

56,3 %

10.877 Buildings with living space, of which this share was built before the first Thermal Insulation Ordinance (Wärmeschutzverordnung)
GAS HEATING

42,4 %

33.254 Homes, of which this share are heated with gas
HEATING OIL

13,3 %

Share of homes with oil heating
DISTRICT HEATING

36,8 %

Share of homes with district heating

Source: Zensus 2022, Statistische Ämter des Bundes und der Länder – Gemeindeergebnisse Rosenheim (aufbereitet von wahlatlas.net), Reference date 15.05.2022

Heat planning and heating replacement in Rosenheim

What this means for your house

In new development areas and outlying areas with lower heat demand, the municipal utility often sees heat pumps and other decentralised solutions as a better choice than district heating. The room-by-room heat load calculation shows what output your heat pump needs and whether your radiators are sufficient; you need it for funding anyway.

Frequently asked questions from Rosenheim

Will district heating come to my street in Rosenheim?

The municipal utility is expanding the network in stages up to 2030, 2035 and 2040, starting with neighbourhoods with high heat demand; the heat plan will determine which areas are included by 2028. For houses outside the expansion areas, we calculate the heat load for a heat pump.

Do you come to my home for the heat load calculation?

No, that is not necessary. You upload floor plans, sections and photos online – for a house in Rosenheim just as anywhere else in Germany. If anything is missing, we ask for it specifically.

How quickly will I receive the result?

You receive your quote within a few minutes. We deliver the expert-checked result within 2 days of our confirmation that the required documents are complete.

Is the calculation sufficient for KfW funding?

Yes. The room-by-room heat load calculation according to DIN EN 12831-1 and hydraulic balancing according to procedure B are the evidence required for heat pump funding.