Heizlastprofi
REGENSBURG · BAVARIA

Heat load calculation in Regensburg

In Regensburg, 70.6 % of homes are heated with gas and only 11.3 % with district heating. There is no large, long-established district heating network – the heat plan divides the city roughly in half into heating network areas and areas to be supplied in a decentralised way. For a heat pump, the room-by-room heat load calculation is the basis.

Buildings and heating systems in Regensburg

BUILT BEFORE 1979

54,2 %

23.282 Buildings with living space, of which this share was built before the first Thermal Insulation Ordinance (Wärmeschutzverordnung)
GAS HEATING

70,6 %

92.661 Homes, of which this share are heated with gas
HEATING OIL

10,4 %

Share of homes with oil heating
DISTRICT HEATING

11,3 %

Share of homes with district heating

Source: Zensus 2022, Statistische Ämter des Bundes und der Länder – Gemeindeergebnisse Regensburg (aufbereitet von wahlatlas.net), Reference date 15.05.2022

Heat planning and heating replacement in Regensburg

What this means for your house

If your house is in an area to be supplied in a decentralised way, an air-source heat pump is usually the obvious solution in Regensburg, because geothermal boreholes can only be approved in the south-west of the city. The room-by-room heat load calculation shows what output your house needs and whether the radiators are sufficient – and it is one of the funding documents.

Frequently asked questions from Regensburg

Can I build a ground-source heat pump with a borehole in Regensburg?

According to the draft heat plan, geothermal borehole drilling can only be approved in the south-west of Regensburg because of the ground conditions; collectors are generally possible outside water protection areas. For every heat pump, the room-by-room heat load is the basis for sizing.

Do you come to my home for the heat load calculation?

No, that is not necessary. You upload floor plans, sections and photos online – for a house in Regensburg just as anywhere else in Germany. If anything is missing, we ask for it specifically.

How quickly will I receive the result?

You receive your quote within a few minutes. We deliver the expert-checked result within 2 days of our confirmation that the required documents are complete.

Is the calculation sufficient for KfW funding?

Yes. The room-by-room heat load calculation according to DIN EN 12831-1 and hydraulic balancing according to procedure B are the evidence required for heat pump funding.