Heat load calculation in Fürth

In Fürth, 71.6 % of homes are heated with gas and only 10 % with district heating. The municipal heat plan names five areas suitable for heating networks – for most of the remaining buildings, it envisages heat pumps. The basis for the right size is the room-by-room heat load calculation.

Buildings and heating systems in Fürth

BUILT BEFORE 1979

56,1 %

20.206 Buildings with living space, of which this share was built before the first Thermal Insulation Ordinance (Wärmeschutzverordnung)
GAS HEATING

71,6 %

67.833 Homes, of which this share are heated with gas
HEATING OIL

13,4 %

Share of homes with oil heating
DISTRICT HEATING

10,0 %

Share of homes with district heating

Source: Zensus 2022, Statistische Ämter des Bundes und der Länder – Gemeindeergebnisse Fürth (aufbereitet von wahlatlas.net), Reference date 15.05.2022

Heat planning and heating replacement in Fürth

What this means for your house

Outside the suitable areas such as the Innenstadt, Südstadt or Hardhöhe, Fürth's heat plan mostly envisages an air-source or ground-source heat pump – although geothermal boreholes are excluded in water protection areas. The room-by-room heat load calculation shows what output your house needs and whether the radiators are suitable; you need it for funding anyway.

Frequently asked questions from Fürth

Will infra's district heating also come to my street in Fürth?

The Südstadt will be connected first; other areas such as Hardhöhe and Nördlich Pegnitzwiesen are still being examined. infra contacts owners two to three years before construction starts. If your house is outside these areas, we calculate the heat load for a heat pump.

Do you come to my home for the heat load calculation?

No, that is not necessary. You upload floor plans, sections and photos online – for a house in Fürth just as anywhere else in Germany. If anything is missing, we ask for it specifically.

How quickly will I receive the result?

You receive your quote within a few minutes. We deliver the expert-checked result within 2 days of our confirmation that the required documents are complete.

Is the calculation sufficient for KfW funding?

Yes. The room-by-room heat load calculation according to DIN EN 12831-1 and hydraulic balancing according to procedure B are the evidence required for heat pump funding.