Heat load calculation in Erlangen

In Erlangen, 27.3 % of homes are heated with district heating, but 21.5 % still with heating oil – and 60.8 % of residential buildings date from before 1979. The municipal heat plan shows where heating networks are growing and where the individual house needs its own solution. For the heat pump, the room-by-room heat load calculation is the basis.

Buildings and heating systems in Erlangen

BUILT BEFORE 1979

60,8 %

20.087 Buildings with living space, of which this share was built before the first Thermal Insulation Ordinance (Wärmeschutzverordnung)
GAS HEATING

44,2 %

68.102 Homes, of which this share are heated with gas
HEATING OIL

21,5 %

Share of homes with oil heating
DISTRICT HEATING

27,3 %

Share of homes with district heating

Source: Zensus 2022, Statistische Ämter des Bundes und der Länder – Gemeindeergebnisse Erlangen (aufbereitet von wahlatlas.net), Reference date 15.05.2022

Heat planning and heating replacement in Erlangen

What this means for your house

If your house is outside the 14 suitable areas – for example in an estate of detached houses – the heat plan mostly envisages an air-source or ground-source heat pump; in the water protection area in the north, geothermal energy is only possible to a limited extent. The room-by-room heat load calculation shows what output is required and whether your radiators are sufficient; you need it for funding anyway.

Frequently asked questions from Erlangen

Am I guaranteed a heating network connection in a suitable area in Erlangen?

No, the city expressly points out that a suitable area is not a guarantee of connection; enquiries go to ESTW. If your house is to be heated with a heat pump, we calculate the room-by-room heat load for it.

Do you come to my home for the heat load calculation?

No, that is not necessary. You upload floor plans, sections and photos online – for a house in Erlangen just as anywhere else in Germany. If anything is missing, we ask for it specifically.

How quickly will I receive the result?

You receive your quote within a few minutes. We deliver the expert-checked result within 2 days of our confirmation that the required documents are complete.

Is the calculation sufficient for KfW funding?

Yes. The room-by-room heat load calculation according to DIN EN 12831-1 and hydraulic balancing according to procedure B are the evidence required for heat pump funding.